Kachelofenverband

How long will it take before a tiled stove is installed and ready to use?

Von • Apr 16th, 2010 • Thema: FAQ's

Fitting a tiled stove takes from 2 days (for a small tiled stove) to a maximum of two weeks in the case of a whole-house heating system. Typical tiled stoves are built in about a week. You can then begin straight away with heating the tiled stove to dry it out.

Schlagworte: ,

Hinterlassen Sie doch einen Kommentar!